Navigasjon

  • Hopp til innhold
NTNU Hjemmeside

RenewHydro

  • FME RenewHydro
  • Forskningsprogrammer
    • Rammebetingelser og fremtidsbilder
    • Fremtidens vannkraftverk
    • Mer effekt og energi
    • Vannkraft i et endret klima
    • Laboratories in RenewHydro
    • Kunnskapsbank
  • Utdanning
    • Forskerutdanning
    • Researcher School
    • RenewHydro PhDs and Postdocs
  • Publikasjoner
  • Arrangementer
    • General Assembly
    • Annual Meeting Research Splash
    • Scientific Committee meeting
    • Usercase meeting nov25
    • Researcher School
    • Lunch webinars
  • Kunnskapsbank
  • Kontakt
    • Partnere
    • Styret
    • Ledergruppen
  1. RenewHydro Forskningsprogrammer
  2. Mer effekt og energi
  3. RP-2.4 Resource allocation and markets

Språkvelger

English

RP-2.4 Resource allocation and markets

×
  • Rammebetingelser og fremtidsbilder
  • Fremtidens vannkraftverk
  • Mer effekt og energi
    • RP-2.1 Sustainable Flexibility Services
    • RP-2.2 Sustainable upgrade and expansion
    • RP-2.3 Energy security and adequacy
    • RP-2.4 Resource allocation and markets
  • Vannkraft i et endret klima
  • Laboratories in RenewHydro
  • Kunnskapsbank
MENY

RP-2.4 Hydropower resource allocation and markets

RP-2.4 Hydropower resource allocation and markets

The value of flexibility in the electricity system is increasing and will require novel support tools for operation of hydropower plants. Hydropower flexibility currently helps balance both domestic and international power by controlling generation at the time needed. The dispatchable nature of hydropower enables supply into markets for day-ahead energy, intraday energy, as well as markets for ancillary services such as reserve capacity, reactive power, and black start capability.  

A core activity for hydropower operators is the offering of capacity/energy into these markets, as well as planning and supervising the operations that is consistent with the market clearing. Therefore, there is a need to fortify the role of hydropower as a flexibility supplier considering market, regulatory, technical and environmental aspects. This project casts hydropower as a flexibility supplier considering multiple markets, supporting decisions in hydropower market operations.  

The goal is to develop analyses and methods to support bidding aspects of hydropower operations. This also links to hydropower planning more generally, for example, regarding how to represent marginal water values, and to supply estimates for capacity upgrade projects or audits of concession terms. 

07 okt 2025

Contact RP-2.4

Contact RP-2.4

Project leader Stein-Erik Fleten

Project participants: 

  • SINTEF Energy
  • NTNU
  • NHH

NTNU – Norges teknisk-naturvitenskapelige universitet

  • For ansatte
  • |
  • For studenter
  • |
  • Innsida
  • |
  • Canvas

Studere

  • Om studier
  • Studieprogram
  • Emner
  • Videreutdanning
  • Karriere

Aktuelt

  • Nyheter
  • Arrangement
  • Jobbe ved NTNU

Om NTNU

  • Om NTNU
  • Bibliotek
  • Strategi
  • Forskning
  • Satsingsområder
  • Innovasjon
  • Organisasjonskart
  • Utdanningskvalitet

Kontakt

  • Kontakt oss
  • Finn ansatte
  • Spør en ekspert
  • Pressekontakter
  • Kart

NTNU i tre byer

  • NTNU i Gjøvik
  • NTNU i Trondheim
  • NTNU i Ålesund

Om nettstedet

  • Bruk av informasjonskapsler
  • Tilgjengelighetserklæring
  • Personvern
  • Ansvarlig redaktør
Facebook Instagram Linkedin Snapchat Tiktok Youtube
Logg inn
NTNU logo